Protect the site before the breaker trips.
Use static and dynamic limits at charger, group or depot level so more chargers can run inside existing electrical capacity.

For CPOs, fleets, asset holders, aggregators and energy teams. SmartFlex coordinates controllable EV charging load around site limits, DSO signals and commercial reporting so flexibility becomes usable value.
The PDF frames SmartFlex around load management, DSO flexibility, infrastructure deferment and driver-protected dispatch.
Use static and dynamic limits at charger, group or depot level so more chargers can run inside existing electrical capacity.
Bring external meter and CT-clamp context into scheduling so charger behaviour reflects what the site can safely support.
Allocate depot power around route priority and ready times so flexibility never sacrifices essential vehicle availability.
Smart allocation can help fleets avoid or defer heavy site energy upgrades while still expanding managed EV charging capacity.
Coordinate opt-in charging assets for flexibility events, keeping dispatch inside agreed driver and site constraints.
Give energy and finance teams the settlement-style evidence they need: event participation, response history, costs and outcomes.
SmartFlex is strongest when the operational rules and market signal are both visible.
Define chargers, site limits, meter inputs, tariff context and priority vehicles before a flexibility event is sent.
Identify eligible charging load that can shift without breaking driver-ready times or site operating rules.
Apply the event across participating assets and keep the charging schedule inside the agreed constraints.
Report participation, response, energy and commercial outcomes back to operators and energy partners.
Referenced CAPEX deferment for avoiding depot energy upgrades
Grid load-balancing events referenced in the product deck
UK DSO integration context for flexibility trading
Safety-first site power optimisation target
A plain-language view of what this page covers, who it helps and where it fits in the Electric Miles platform.
It connects managed charging assets to load management, flexibility dispatch, site constraints and commercial reporting.
Asset holders, energy partners, CPOs and organisations managing distributed charging assets.
More controllable charging load, better grid participation and clearer reporting.
A working session with our flexibility engineering team. Bring your network model; leave with a pilot plan.